{"id":10878,"date":"2024-06-21T13:17:18","date_gmt":"2024-06-21T13:17:18","guid":{"rendered":"https:\/\/dev.cordobacorp.com\/?p=10878"},"modified":"2026-03-07T17:15:17","modified_gmt":"2026-03-08T01:15:17","slug":"pipeline-safety-enhancement-plan-psep","status":"publish","type":"post","link":"https:\/\/www.cordobacorp.com\/stage\/?p=10878","title":{"rendered":"SoCalGas Pipeline Safety Enhancement Plan (PSEP)"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Overview<\/h2>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:25px;margin-bottom:25px;background-color:#9d2335;color:#9d2335\"\/>\n\n\n\n<p>In 2011, the California Public Utilities Commission (CPUC) ordered all natural gas transmission operators in the State of California to develop an implementation plan to achieve the goal of orderly and cost-effectively testing or replacing all natural gas transmission pipelines in their system that have not been pressure-tested. To comply with the CPUC\u2019s directive, Southern California Gas Company (SoCalGas) implemented a $3 billion Pipeline Safety Enhancement Plan (PSEP) through which it has identified various pipeline sections throughout its system without a record of a pressure test and has slated them to be pressure-tested or replaced.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Cordoba\u2019s Role<\/h2>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:25px;margin-bottom:25px;background-color:#9d2335;color:#9d2335\"\/>\n\n\n\n<p>Cordoba delivers streamlined, end\u2011to\u2011end support for SoCalGas\u2019s Pipeline Safety Enhancement Plan (PSEP), providing project management, engineering, construction management, field engineering, pipeline design, environmental oversight, project controls, permitting coordination, and inspection services under a direct Master Service Agreement. Our team manages technically complex hydrotest and pipeline upgrade projects that require close coordination with multiple cities, counties, utilities, and permitting agencies.<\/p>\n\n\n\n<p>Representative assignments include multi\u2011jurisdictional hydrotests such as the SL\u202f32\u201121 Section\u202f3 project across San Marino, South Pasadena, and Alhambra, and the SL\u202f31\u201109 project, which required specialized design solutions around major water, sewer, rail, and highway infrastructure. Cordoba also led the Wheeler Ridge Bundle\u2014testing and replacing 13 segments of a 17.6\u2011mile, early\u20111900s pipeline in Kern County\u2014navigating limited rights\u2011of\u2011way, multiple taps, roadway crossings, and extensive permitting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Overview In 2011, the California Public Utilities Commission (CPUC) ordered all natural gas transmission operators in the State of California to develop an implementation plan to achieve the goal of orderly and cost-effectively testing or replacing all natural gas transmission pipelines in their system that have not been pressure-tested. To comply with the CPUC\u2019s directive, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5450,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[105,102,104,103,91,90,106],"class_list":["post-10878","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-construction-management-including-inspection-and-field-engineering","tag-engineering-and-design","tag-environmental-project-management","tag-municipal-permit-coordination","tag-project-controls","tag-project-management","tag-stakeholder-coordination"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10878"}],"version-history":[{"count":3,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10878\/revisions"}],"predecessor-version":[{"id":14557,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10878\/revisions\/14557"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/media\/5450"}],"wp:attachment":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}