{"id":10923,"date":"2024-06-21T13:49:11","date_gmt":"2024-06-21T13:49:11","guid":{"rendered":"https:\/\/dev.cordobacorp.com\/?p=10923"},"modified":"2026-01-19T19:49:12","modified_gmt":"2026-01-20T03:49:12","slug":"inland-feeder-program-arrowhead-tunnels-and-highland-pipeline","status":"publish","type":"post","link":"https:\/\/www.cordobacorp.com\/stage\/?p=10923","title":{"rendered":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Overview<\/h2>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:25px;margin-bottom:25px;background-color:#9d2335;color:#9d2335\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest water lines built in the past three decades. Construction of the Inland Feeder, particularly the project\u2019s Arrowhead west and east tunnels under the San Bernardino Mountains, was difficult as these tunnels traversed extremely difficult geologic conditions with numerous earthquake fault zones.<\/p>\n\n\n\n<div style=\"height:25px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Cordoba\u2019s Role<\/h2>\n\n\n\n<hr class=\"wp-block-separator has-text-color has-alpha-channel-opacity has-background is-style-default\" style=\"margin-top:25px;margin-bottom:25px;background-color:#9d2335;color:#9d2335\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Cordoba Corporation worked with the construction management team to provide schedule monitoring and claims analysis. We also provided 24-hour quality control inspection services on the two tunnels. Our inspectors monitor conditions including water pressure, slurry mix, and boring speeds.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[88,89,87],"class_list":["post-10923","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-water","tag-claims-analysis","tag-quality-control-inspection-services","tag-schedule-monitoring"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest\" \/>\n\t<meta name=\"robots\" content=\"noindex, nofollow, max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"admin\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.cordobacorp.com\/stage\/?p=10923\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Cordoba Corporation -\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation\" \/>\n\t\t<meta property=\"og:description\" content=\"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.cordobacorp.com\/stage\/?p=10923\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-06-21T13:49:11+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-01-20T03:49:12+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#blogposting\",\"name\":\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation\",\"headline\":\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline\",\"author\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?author=1#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/WATER_InlandFeeder2.jpg\",\"width\":850,\"height\":500,\"caption\":\"Inland Feeder\"},\"datePublished\":\"2024-06-21T13:49:11-07:00\",\"dateModified\":\"2026-01-19T19:49:12-08:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#webpage\"},\"articleSection\":\"Water, Claims analysis, Quality control \\\/ Inspection services, Schedule monitoring\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?cat=15#listItem\",\"name\":\"Water\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?cat=15#listItem\",\"position\":2,\"name\":\"Water\",\"item\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?cat=15\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#listItem\",\"name\":\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#listItem\",\"position\":3,\"name\":\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?cat=15#listItem\",\"name\":\"Water\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/#organization\",\"name\":\"Cordoba Corporation\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/cropped-HardHat_Logo_Official-150x150-1.jpg\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923\\\/#organizationLogo\",\"width\":512,\"height\":512},\"image\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?author=1#author\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?author=1\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/56b0167dce1404affaad0c9feedb3d82ce647b60717f148ffd70f6576fd8bea7?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"admin\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#webpage\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923\",\"name\":\"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation\",\"description\":\"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\\u2019s water delivery take away capacity. The Inland Feeder was one of the largest\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?author=1#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?author=1#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/WATER_InlandFeeder2.jpg\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923\\\/#mainImage\",\"width\":850,\"height\":500,\"caption\":\"Inland Feeder\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/?p=10923#mainImage\"},\"datePublished\":\"2024-06-21T13:49:11-07:00\",\"dateModified\":\"2026-01-19T19:49:12-08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/#website\",\"url\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/\",\"name\":\"Cordoba Corporation\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.cordobacorp.com\\\/stage\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation<\/title>\n\n","aioseo_head_json":{"title":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation","description":"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest","canonical_url":"https:\/\/www.cordobacorp.com\/stage\/?p=10923","robots":"noindex, nofollow, max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#blogposting","name":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation","headline":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline","author":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?author=1#author"},"publisher":{"@id":"https:\/\/www.cordobacorp.com\/stage\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2015\/12\/WATER_InlandFeeder2.jpg","width":850,"height":500,"caption":"Inland Feeder"},"datePublished":"2024-06-21T13:49:11-07:00","dateModified":"2026-01-19T19:49:12-08:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#webpage"},"isPartOf":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#webpage"},"articleSection":"Water, Claims analysis, Quality control \/ Inspection services, Schedule monitoring"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage#listItem","position":1,"name":"Home","item":"https:\/\/www.cordobacorp.com\/stage","nextItem":{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage\/?cat=15#listItem","name":"Water"}},{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage\/?cat=15#listItem","position":2,"name":"Water","item":"https:\/\/www.cordobacorp.com\/stage\/?cat=15","nextItem":{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#listItem","name":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#listItem","position":3,"name":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline","previousItem":{"@type":"ListItem","@id":"https:\/\/www.cordobacorp.com\/stage\/?cat=15#listItem","name":"Water"}}]},{"@type":"Organization","@id":"https:\/\/www.cordobacorp.com\/stage\/#organization","name":"Cordoba Corporation","url":"https:\/\/www.cordobacorp.com\/stage\/","logo":{"@type":"ImageObject","url":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923\/#organizationLogo","width":512,"height":512},"image":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/www.cordobacorp.com\/stage\/?author=1#author","url":"https:\/\/www.cordobacorp.com\/stage\/?author=1","name":"admin","image":{"@type":"ImageObject","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/56b0167dce1404affaad0c9feedb3d82ce647b60717f148ffd70f6576fd8bea7?s=96&d=mm&r=g","width":96,"height":96,"caption":"admin"}},{"@type":"WebPage","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#webpage","url":"https:\/\/www.cordobacorp.com\/stage\/?p=10923","name":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation","description":"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.cordobacorp.com\/stage\/#website"},"breadcrumb":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#breadcrumblist"},"author":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?author=1#author"},"creator":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?author=1#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2015\/12\/WATER_InlandFeeder2.jpg","@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923\/#mainImage","width":850,"height":500,"caption":"Inland Feeder"},"primaryImageOfPage":{"@id":"https:\/\/www.cordobacorp.com\/stage\/?p=10923#mainImage"},"datePublished":"2024-06-21T13:49:11-07:00","dateModified":"2026-01-19T19:49:12-08:00"},{"@type":"WebSite","@id":"https:\/\/www.cordobacorp.com\/stage\/#website","url":"https:\/\/www.cordobacorp.com\/stage\/","name":"Cordoba Corporation","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.cordobacorp.com\/stage\/#organization"}}]},"og:locale":"en_US","og:site_name":"Cordoba Corporation -","og:type":"article","og:title":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation","og:description":"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest","og:url":"https:\/\/www.cordobacorp.com\/stage\/?p=10923","og:image":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg","og:image:secure_url":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg","article:published_time":"2024-06-21T13:49:11+00:00","article:modified_time":"2026-01-20T03:49:12+00:00","twitter:card":"summary_large_image","twitter:title":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline - Cordoba Corporation","twitter:description":"Overview Completed in 2009, the $1.2 billion, 44-mile Inland Feeder water line fully integrates the Southern California MWD\u2019s distribution system, connecting State Water Project (SWP) supplies with the Colorado River Aqueduct to flow into Diamond Valley Lake reservoir. It nearly triples Metropolitan\u2019s water delivery take away capacity. The Inland Feeder was one of the largest","twitter:image":"https:\/\/www.cordobacorp.com\/stage\/wp-content\/uploads\/2024\/04\/cropped-HardHat_Logo_Official-150x150-1.jpg"},"aioseo_meta_data":{"post_id":"10923","title":null,"description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-01-20 03:49:51","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":{"faqs":[],"keyPoints":[],"titles":[],"descriptions":[],"socialPosts":{"email":[],"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2025-02-13 19:49:42","updated":"2026-01-20 03:49:51"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.cordobacorp.com\/stage\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.cordobacorp.com\/stage\/?cat=15\" title=\"Water\">Water<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tInland Feeder Program, Arrowhead Tunnels and Highland Pipeline\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.cordobacorp.com\/stage"},{"label":"Water","link":"https:\/\/www.cordobacorp.com\/stage\/?cat=15"},{"label":"Inland Feeder Program, Arrowhead Tunnels and Highland Pipeline","link":"https:\/\/www.cordobacorp.com\/stage\/?p=10923"}],"_links":{"self":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10923","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10923"}],"version-history":[{"count":1,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10923\/revisions"}],"predecessor-version":[{"id":13770,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/posts\/10923\/revisions\/13770"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=\/wp\/v2\/media\/2190"}],"wp:attachment":[{"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10923"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10923"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cordobacorp.com\/stage\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10923"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}